JSESD007: Design of an All-in-One System Lightweight Motor Vehicles Maintenance Machine: A Case for an Underground Min
Keywords:
automobile, finite-element-analysis, maintenance, SOLIDWORKSAbstract
Equipment availability is one major priority in any mining activity, and
the motor vehicle is one such equipment that needs rigorous and strategic
maintenance to maximise reliability. The case study mine experiences
extended downtime when major components of its Low Value Mineral Venture
(LWMV) fail (engine, transmission, etc.). Addressing LWMV downtime
sometimes requires hoisting of components to the surface, where equipment is
abundant, for maintenance. The machine proposed in this article, the Grouped
Maintenance of Ten Total Operations (GM-OT10), eliminates the need to
hoist anything to the surface by facilitating all major maintenance activities
underground. The GM-OT10 facilitates maintenance activities by integrating
various maintenance components which can be assembled in any place. In
addition, it links well with the Internet of things and artificial intelligence
to facilitate fault diagnostics and prediction. The proposed machine has not
been utilised in any mining sector globally. The GM-OT10 design utilises
pneumatics for most of its actuations, thus reducing direct dependency on
electricity. The choice of pneumatics is influenced by the widespread use of
compressed air in most underground mining operations. The proposed GM
OT10 has been designed to suit the harsh and unpredictable underground
mining environment. Specifically, the beams and robust framework were
designed with a higher safety factor using SOLIDWORKS. Finite element
analysis, carried out on critical load-bearing components, showed von-Mises
stress values below the design stresses. A displacement and a strain analysis
were also carried out using the SOLIDWORKS simulation package, and
the numerical values obtained indicate minimum strains and displacement
within the allowable range.